K. Rokugo, M. Moriyama, M.Horita, N. Morii (2010). "Measurement of movement in multi layer sprayed lining using high performance fiber reinforced cement composite (HPFRCC) with multiple cracks." In Proceedings of FraMCoS 7, Jeju, South Korea.
K. Rokugo, M. Moriyama, M.Horita, N. Morii. "Measurement of movement in multi layer sprayed lining using high performance fiber reinforced cement composite (HPFRCC) with multiple cracks." Paper presented at FraMCoS 7, Jeju, South Korea, 2010.
K. Rokugo, M. Moriyama, M.Horita, N. Morii, "Measurement of movement in multi layer sprayed lining using high performance fiber reinforced cement composite (HPFRCC) with multiple cracks," in Proc. FraMCoS 7, Jeju, South Korea, 2010.
@inproceedings{k-rokugo2010,
title = {Measurement of movement in multi layer sprayed lining using high performance fiber reinforced cement composite (HPFRCC) with multiple cracks},
author = {K. Rokugo, M. Moriyama, M.Horita, N. Morii},
year = {2010},
booktitle = {Proceedings of FraMCoS 7},
address = {Jeju, South Korea},
}
TY - CPAPER
TI - Measurement of movement in multi layer sprayed lining using high performance fiber reinforced cement composite (HPFRCC) with multiple cracks
AU - K. Rokugo
AU - M. Moriyama
AU - M.Horita
AU - N. Morii
PY - 2010
T2 - Proceedings of FraMCoS 7
CY - Jeju, South Korea
UR - https://framcos.org/wp-content/uploads/framcos-papers/Measurement_of_movement_in_multi_layer_sprayed_lining_using_high_performance_fib.pdf
AB - The Hida Tunnel is a 10.7km long expressway located between the Hida Kiyomi IC and the Shirakawa-go IC on the Tokai-Hokuriku Expressway. Both the main tunnel and the evacuation tunnel are more than 10km long, but the construction period was shortened by simultaneous construction of facilities such as the widened part at the emergency parking areas, paving, etc. Therefore the lining concrete, which has a large effect on the overall construction period, was constructed in part by multi-layered sprayed lining to achieve a reduction in the construction period. This paper reports on the construction of the multi-layer sprayed lining at…
ER -