Interface between connecting steel plates and concrete plays an important role on performance of precast reinforced concrete shear wall system. Embedded steel plate provides dry connection with prefabricated panels as bolted or welded plate connection via anchoring rods or bolts…
Interface between connecting steel plates and concrete plays an important role on performance of precast reinforced concrete shear wall system. Embedded steel plate provides dry connection with prefabricated panels as bolted or welded plate connection via anchoring rods or bolts during fabrication process. Recently, prefabricated techniques gained momentum due to time and material savings, enhanced quality control and increased efficiency with sustainability. Connection in precast system alters failure mode of the entire system by improving damage resistance. This paper describes the pull-out bond tests performed on a steel plate embedded in concrete using three distinct methods of anchoring to analyze behavior of steel plate-concrete embedment under tension loading. The test specimen consists of steel plates embedded in concrete blocks with three different anchoring schemes by a) rod, b) bolt and c) bolt with washer nut arrangement as anchorage and different number of bolts. The steel plates were connected to a loading frame through bolts and nut system, and then transferred the load to the plate to measure the slip with reference to concrete surface. The load- displacement response of the connection has been monitored, and the failure modes were examined. The test results have been compared with the existing analytical model to determine the pull-out bond behaviour and influence of number of bolts and the concrete strength. Anchoring using bolt and washer nut system performed better than the other anchoring methods.